"*" indicates required fields
The FRP cooling tower utilized in the Shanghai Laogang Renewable Energy Utilization Center Phase II Project was designed by SPX Company. It is a mechanical
The Rama 8 Bridge, situated over the Chao Phraya River in Bangkok, the capital of Thailand, was completed in 2001 and has since been operational.
The connecting corridor in the Qingdao Golden Land Bay project is built with 800*300 large rectangular tubes produced by Spare using pultruded and formed profiles.
The Beijing Vanke Jade West Lake residential project comprises 20 small high-rise buildings, with a total roof area of 12,000 square meters. The roofing material
The apron, situated atop the Tres Cruces Hospital in Bilbao, Spain, spans 3 meters and can accommodate helicopters weighing up to 6 tons (13,200 lbs).
Spare has developed and manufactured a significant component, the FRP connector, for sandwich wall construction. This connector is utilized to link the concrete slabs on